No furloughs this year means we're back to thinking about remodeling the bathroom off of our bedroom. Our first contractor just left, and will be sending us a quote, along with a couple of websites for tubs and cabinetry. He's suggesting a cabinet maker, but I don't think I want to go with custom cabinets for that little bathroom. If I was going to spring for hand-made cabinets, I'd do it in the kitchen before I put them in a tiny bathroom. We need to weigh the need for an updated bathroom with our desire to live in this house for a limited number of years before retiring to a warmer climate, so I think Home Depot cabinetry is just fine for this project. I wish we didn't have to do this at all, but the tub and flooring in this bathroom are not of the highest quality, and are original to the house, which was built in 1993. We changed out the sink and counter top later, but I did something dumb and dropped a ceramic cup into the bowl of the sink and cracked it...not the cup, but the sink itself. The $3 cup is just fine.
Since we have to do something about the sink, I began to think about moving the toilet and sink. The plans for the house have them reversed, but the original owner had very specific ideas for her home, and I think her idea for this configuration was a mistake. The plans look much more functional to me. So, the idea is a new tub, surrounding tile, a tile floor, a new cabinet and sink, probably a new toilet, and possibly a pocket door rather than the traditional door that is there. Bobby has shredded the molding around the existing door and since the bathroom is so small anyway, a sliding door would allow more room to move around.
Unfortunately, Wesley's knees don't allow for him to do the work this time around. How much do you suppose this little project will set us back??
No comments:
Post a Comment